Improvement of Chickahominy River Virginia: 1895 Report

IMPROVEMENT OF CHICKAHOMINY RIVER VIRGINIA
This river is one of the principal tributaries of the James River and is navigable at high water for vessels drawing 12 feet to Binn Bar 2 miles below Windsor Shades. The latter place is the head of navigation and is 25 miles from the mouth of the river. Previous to artificial betterment the channel from Binn Bar to Windsor Shades was obstructed by several shoals with a depth of 4 to 5 feet at low water and the entrance to the river was obstructed by a bar. The present project of improvement is to dredge a channel from 100 to 150 feet wide and not less than 8 feet deep at low water through the shoals near the head of navigation and a channel 200 feet wide and 14 to 15 feet deep at low water through the bar at the entrance. The rise of the tide is about 3 feet. The amount expended on the present project to June 30, 1894 was 23,829.91 The channel through the bar at the entrance to the river has been dredged to the projected dimensions An examination made in January 1891 of the work hitherto done showed that very little shoaling had taken place in the channels dredged since 1878 the worst shoals being near Old Fort. These shoals and those between Binn Bar and Windsor Shades have since been dredged to a depth not less than 8 feet at low water and to a width of 50 feet excepting a part of Windsor Shades Bar where the width is only 40 feet.
Five thousand dollars was appropriated for this improvement by act of July 13, 1892. A contract was entered into with Chester T. Caler, of Norfolk Va., on March 18, 1893 to do the required dredging at 23 cents per cubic yard for material deposited on shore and 13 cents per cubic yard for material deposited by dumping. Work under this contract which was commenced June 9, 1894 was continued during the present fiscal year until July 29, 1894. 18,188 cubic yards of material being removed during July. Thirty-five thousand six hundred and thirty four cubic yards was removed and deposited from scows under this contract from Upper and Lower Binn, Osborn, Old Fort. and Windsor Shades bars increasing the channel width through each bar to 100 feet with 9 feet depth at low water. The aggregate length of the channels dredged was 5,875 feet. The project for this improvement is now complete a channel 100 feet wide and 8 feet deep at low water being completed from the mouth to the head of navigation and this is deemed sufficient for the present and prospective commercial interests of the locality. The amount expended on this improvement during the fiscal year ended June 30, 1895 is $5,170.09 for payment on contract inspection and office expenses
This work is in the collection district of Petersburg, Va which is the nearest port of entry
Nearest light house: Deep Water Light in James River Virginia
Nearest port Fort Monroe Va
The amount of revenue collected at the port of Petersburg, Va during the fiscal year ended June 30, 1895 is $00.00


 The following statistics relative to the commerce of the Chickahominy River Virginia during the calendar year 1894 were furnished by Mr L. F. Barnes of Boulevard, Va.

                                                 Articles
                    Amount      Value
                          tons   $
Cordwood 18 000 90 000
Sawed lumber    6 000 50 000
Vegetables           500 25 000
Fish                     250 10 000
Fertilizer              500 4 000
Total               25 250     179 000



Vessels Number     Average draft    Average tonnage
Feet.
Steam 2 6 6
Sail          200              12 250
Barges 25 6 175
Lighters     25 4 100
Rafts 10
Total 262




-Report of the Chief of Engineers U.S. Army, Part 2
Annual report (United States. War Dept.)

 U.S. Government Printing Office, 1895


Saturday, October 5, 2013

Improving the Chickahominy-1879

IMPROVEMENT OF CHICKAHOMINY RIVER VIRGINIA

This improvement was commenced during the last fiscal year under the appropriation of $5,000 made June 18, 1878. The original estimate was based simply upon an examination of the river and it was therefore necessary first to make surveys of the several obstructions. Accordingly in July, 1878 surveys of Binn's Bar, Old Fort Bar, and Windsor Shades Bar were made. At Binn's Bar, 2 miles below Windsor Shades, and 23 miles from the mouth of the river, the least depth found was 4 feet. The least depth at Old Fort Bar was 5.4 feet, but the natural channel had not sufficient width.
The least depth at Windsor Shades Bar was found to be 4.0 feet. Proposals for dredging channels through these bars were invited by public advertisement and the following were received October 30, 1878

Abstract of proposals for dredging in Chickahominy River Virginia opened at 12 m on Wednesday October 30 1878

G. H. Ferris            Baltimore, Md     $0.20    Mar 1 1878- July 1 1879         1 dipper     300*
H. E. Culpepper     Portsmouth, Va        .14    Dec 1 1878- May 20 1879       ---------   ----*
Daniel Constantine  Baltimore, Md         .14    Nov 20 1878- Feb 20 1879    1 Osgood   500*

Contract awarded to Mr H. E. Culpepper of Norfolk Va


During the winter of 1878-79 ice formed in the Chickahominy and delayed the commencement of the work until February 8 1879 The contractor commenced with one Osgood dipper dredge at Binn's Bar The material here was soft mud and was excavated readily. The channel was dredged to a width of 100 feet with a depth of 8 feet at low water Old Fort and Windsor Shades Bars were next dredged to the same depth and a width of 60 feet. The material found here was sand. A second dredge was put on the work by the contractor April 17 and the dredging was completed as far as the funds allowed May 5 1879. As to the future work on this improvement the channel already excavated should be widened and it is also important that several dikes be built for the purpose of closing subsidiary channels through which the tide now flows. The estimated cost of this work is $ 10,000.

Windsor Shades is now the head of navigation. Above this the river rapidly shoals to a very small stream winding its way through a heavy growth of cypress and other timber. The public interests hardly warrant the improvement of above Windsor Shades to the same depth as below at the present time. In order to estimate its cost even a detailed survey of the entire 7 miles of river to Forge Bridges would be necessary. Two appropriations have been made as follows June 1. 1878, $5,000 March 3. 1879, $1,000
The following are the estimated statistics of trade:
Seventy five thousand cords wood at $3 per cord
5,000,000 feet timber at $10 per thousand
75,000 railroad tics at $35 per thousand

 Merchandise valued at ..................... $150,000
Grain, vegetables, &c. valued at ..........$20,000
Lime, fertilizers &c. valued at ..............$10,000
Fish valued at ...................................   $15,000

Seven hundred Bail vessels per year One steamboat one trip per week.
For the completion of the work, $9,000 will be required.

The nearest port of entry is Richmond, Va where the collections for the fiscal were $15,030.62.

                                                           Money statement

July 1 1878 amount available ....................................................$5,000.00
Amount appropriated by act approved March 3 1879...............  1,000.00
                                                                                                                   $6,000.00
July 1 1879 amount expended during fiscal year ..........................................   4,982.38
July 1 1879 amount available......................................................................... 1,017.62

Amount estimated required for completion of existing project .........................9,000.00
Amount that can be profitably expended in fiscal year ending June 30 1881.....9,000.00


-ANNUAL REPORT OF LIEUTENANT- COLONEL GEORGE THOM, CORPS OF ENGINEERS, 
FOR THE FISCAL YEAR ENDING JUNE 30, 1879 
Report of the Chief of Engineers Army
United States. Army. Corps of Engineers.
U.S. Government Printing Office, 1879



*[ a) price per cubic yard b) time of completion c) machines needed d) cu. yds of work a day]