Providence Forge 1931

Providence Forge 1931
photograph of Providence Forge looking south from Railroad tracks- 1931

Saturday, January 22, 2022

Train Holdup 1907

 

George Speake, Who Obstructed the Track and Fired Upon a Freight Engine Near Providence Forge, is in Jail Here. 

 -George Speake, of Baltimore, was arrested yesterday morning at 9 o’clock at Providence Forge and brought to RICHMOND and lodged In the county jail.

 Speake attempted to hold up a Chesapeake and Ohio east-bound freight train yesterday morning as the train was nearing Providence Forge. The engineer noticed some obstructions on the track and later saw, after whistling for the brakes, that a man was standing in the middle of the track. As the engine approached the man raised his hand and began firing. Conductor Cobb and Brakeman Brenan caught the man and transferred him to a passenger train bound for RICHMOND.


-News Leader, May 6, 1907


The last "major" American train robbery was attempted on November 25, 1937, outside El Paso Texas against a passenger train of the Southern Pacific Railroad. The two would be robbers were overcome by passengers and badly beaten for their effort.



Sunday, January 16, 2022

Flooding- 1948

             

                        Washed-Out Roads Keep Crews Busy 

RICHMOND, VA., May 27—(AP) —Crews of workmen today were busy restoring washed out rail and highway lanes over which traffic between here and Newport News had been halted.

 Heavy rainstorms in New Kent and Charles City Counties yesterday flooded to as much as eight feet sections of the Chesapeake and Ohio Railway and U.S. Highway 60 in the Windsor Shades area.

 Whether rail and highway traffic could be resumed over these two arterial lines sometime today had not been determined early this morning by C.& O. and State Highway Department Officials. A lot depended upon whether additional rainfall fell.

 A C.& O. spokesman said the railroad “hopes" to have one track open for resumption of train movements by this afternoon. As much as 250 feet of the railroad's main line fill had been undermined by the torrents.

 Trains had not moved between here and Newport News since train No. 45, The Sportsman, was halted about 2 p.m. yesterday at Providence Forge and has turned back in Richmond. 

 The Highway Department was routing traffic between here and Williamsburg over route 33. This road was covered with four to six inches of water for a while near New Kent Courthouse; but was clear by nightfall last night. 

 Where Route 60 paralleled the railroad east of Providence Forge, long stretches of highway were covered with water to depths up to eight feet late yesterday. 


-Suffolk News-Herald,  27 May 1948


Wednesday, January 5, 2022

Civil War Operations on the York River Railroad

 A note on the scale of the operations on the York River Railroad during the Peninsula Campaign.


                                                        “War Department

Washington City, D. C., May 17, 1862

Maj. Gen. George B. McClellan,

Headquarters, Army of the Potomac

There have been forwarded from Baltimore to West Point five locomotives, eighty cars, 3 miles in length of railroad iron, 30,000 feet, board measure, of timber, one dozen frogs, one dozen switch irons, 1,200 chairs, with full supply of rail spikes, the last of which, it is expected, will reach the Peninsula on Monday.

P.H. Watson

Assistant Secretary of War

 

-Official Record, Series 1, Volume 11, (Part 3), p. 178


“March 14, 1862, General McClellan instructed me to have five locomotives and eighty cars loaded upon vessels in the harbor of Baltimore and held subject to his orders with a view to using them in his contemplated Peninsula campaign. They were purchased from Northern railroad companies, loaded as directed, and remained on the vessels until early May, when they were sent to White House, Va., and placed upon the Richmond and York River Railroad. Another engine was added in June to this number, and all employed in transporting supplies between White House and the front, which, toward the close of June, was twenty miles from White House and four miles from Richmond. Upon the withdrawal of the Army of the Potomac to Harrison's Landing, June 28, all the rolling stock was destroyed or damaged as far as practicable to prevent it from falling into the hands of the enemy.”

       D. C. McCallum, Military Director & Superintendent of Railroads

 

-Official Record, Series 3, Volume 5, pp. 974-975.


citations found in  Rodney Lackey's article, "Civil War Logistics and Organization"



Friday, December 17, 2021

The Christmas Chase

 This a reposting from 2014


A Hot Chase With a Big Pack in New Kent.

(Special to The Times-Dispatch.)
ROXBURY, VA., December 27.- One of the most exciting fox chases in New Kent for some time took place Christmas day, when Mr. Lee Jenk Boze and his brother, Joe Boze, of Highland Springs, with thirty-six hounds; Willie and George Ellyson, of Quinton; W.H. Graves, of Seven Pines, with fifty-four dogs, as fine as can be found in Virginia. The day was an ideal one-cool, clear and calm. After leaving Dispatch Station Mr. Joe Boze's Little Ruby, struck a hot trail, and was soon followed by her companions, Storm and Fleet. They soon had old Reynard on his feet, and without a hitch for forty minutes the sweetest music in all the world rolled over the hills from the red mouths of forty hounds, which, mingled with the shouts of many happy riders, could be heard for many miles out on the soft morning breeze.
The old fox, being hotly pursued, used every trick known to his kind to elude its pursuers, but alas, poor Reynard, with brush down, tongue protruding and all heart gone, headed for a hog lot and sought protection among the hogs. Here he found no friends, for soon the hogs had the fox cornered and was making short work of him, and when the boys came up it took seven huntsmen to get dogs, fox and hogs separated. In a moment old Reynard was cold in death, swinging from the saddle of Mr. Graves.

-The Times-Dispatch(Richmond), December 28, 1905


I assume the Ellysons mentioned above are William T. Ellyson (1866-1944) and George Washington Ellyson (1875-1960) brothers, the sons of Richard Abner Ellyson.



Saturday, November 20, 2021

Report on the York River Railroad- 1861

 

REPORT OF ENGINEER AND SUPERINTENDENT 

                                                                      OFFICE ENG. AND SUPR. & Y.R.RR                                                                                                              October 1 1861 

GENTLEMEN, The annual report from this office is confined entirely to the operations incident to the completion, its present condition and necessities of the road. 

  As to the operations in the transportation department, receipts, disbursements, &c, you are referred to the report of the treasurer, which is believed to compare favorably with that of the preceding year.


  Completion of road to West Point 

 At the date of the last report the, 38th section, together with the wharf at the eastern terminus, remained unfinished, although the road had been in operation to West Point over a temporary track since the 1st day of August.

 The 1st day of January found the work still unfinished, when the contract was abandoned, and it was carried on to completion by the company at a cost much below the contractor's prices. The wharf is built in the most substantial manner, of superior materials, and capable of sustaining the heaviest locomotives.

 On the 29th day of March last the company's steamer West Point made her first connection with the train at the proper terminus of the road. 

 From this date the through working of the road may be considered to commence having been heretofore restricted to a very light freight business owing to the difficulty in the way of transhipment at West Point. 


Condition of road bed road repairs &c 

 During the year a very considerable portion of the road bed has been improved, by being partially ballasted with sand and gravel, an inexhaustible quantity of which is found upon the line; and I would recommend a thorough improvement of the road in this respect, as the comfort, safety and reduced cost of repairs to road and machinery will afford an ample return for the investment.

 The wet nature of some parts of the road requiring constant attention to protect the iron, and the constant ditching required to keep the heavy sand cuts upon other portions clear, run up the cost of road repairs beyond the usual figures at best; but during the last year, which has been peculiarly trying upon all the roads in the state, this account is increased by a number of heavy slides and the carrying away of several embankments.

 The most troublesome of these are the slides at Romancoke bluffs, upon the Pamunkey, where a change of alignment has been determined upon, and a force engaged in carrying it into effect 


                                              Bridging trestle work and cutouts 

 The Pamunkey and Upper Black creek bridges sustained some injury from the high waters of last spring, but were repaired at light cost. The latter will require an abutment to be replaced; the foundation of which yielded to the action of the water, the bridge being now supported by a wooden abutment at that end Lower Black Creek, Chickahominy and Cohoke bridges are in good order. Gillies' creek trestle has been nearly filled in, and the work is now suspended for the want of cars.

 The trestle across Chickahominy bottom requires to be filled in, which when done, will necessitate the introduction of another span of fifty feet, and the building of the necessary abutments. The present single span of fifty feet, which rests upon pile abutments, will not afford sufficient water way.

 There are several smaller streams, crossed by light trestles, which I would recommend to replace with culverts.


Buildings turnouts water stations &c 

 During the year there has been completed, at Richmond, a substantial and convenient brick passenger depot, with extensive shed attached, sufficient to accommodate the passenger and baggage cars now upon the road.

 At Fair Oaks and Summit, there are neither turnouts or buildings of any description, nor does the business of the former point require any at present.

 At Meadow, Dispatch and Tunstall's, the only other points west of the Pamunkey, sufficient buildings and turnouts had been completed prior to the date of the last report.

 At Fish Hall*, Cohoke, Sweet Hall, Romancoke and West Point, there are neither buildings or turnouts, except at Romancoke and West Point- at each of which places there is a single siding. The grading of the depot lot at Richmond has so far progressed during the year to admit of the side tracks being run under the shed, and the passenger cars, while at this end of the line are now protected from the weather.

 The temporary track through the village of West Point has not been removed, owing to the unimproved condition of the streets connecting the depot lot with the high land, and the convenience it afforded of delivering ordnance, supplies, &c. at that point being a military post.

 It is designed, however, as soon as the proper crossings to and necessary buildings at the terminus of the road have been completed, to remove this, as the iron and ties are needed at other points.

 There are three water stations upon the line: one at Richmond, supplied, without pumping, from Bloody run spring; one at Dispatch, supplied by means of rams, from Carter's mill pond, and the other at the crossing of the Pamunkey river, supplied by hand pump.

 It is proposed to erect a wind mill to do the pumping at West Point, which, if it succeeds, and it can scarcely prove a failure at so exposed a point near the sea coast, labor in this department will become unnecessary, and a saving of 300 per annum effected.

Outfit

 We have four engines- the York and Atlantic, new and in good order; the Mattaponi and Pamunkey, in as good condition as age and hard work permit, having been purchased of the Central rail road company (then old machines) and run constantly since the track laying on your road commenced. The Pamunkey, which went down with the slide at Romancoke bluff, and was reduced to a wreck, has been repaired, and is again at work.  

During the unusual wet weather of last spring an accident occurred, resulting in no damage, except to the road bed, unheard of before, I believe, in the history of roads.

 An embankment upon the lower end of the line gave way with a section of track under the engine Atlantic, while standing letting it down to a bearing fifteen feet below the grade of the road, without getting off the iron or losing its perpendicular. The engine was gotten out without being injured in the slightest degree.

 We have four first class passenger cars, one baggage car, ten box and fifteen flat cars, four material (side dumpers) cars and fifteen small ditching. hand and crank cars.

 Under many of the freight cars new trucks of a superior kind, built at our own shops, have been introduced; and from time to time, until all the old ones have been replaced, which are of a light and imperfect character, this work will be carried on.

 An express and baggage car has been commenced, and, during the coming year, it is calculated to make such additions to our insufficient amount of stock as the means of the company and facilities for doing so will admit. 


(then followed an item list of the cost of putting the road in a "thorough state of completion" and costs of equipment.)


 - Annual Report of the Board of Public Works to the General ..., Parts 3-4 Doc. 17


The Chief Engineer writing this is Robert H. Temple of Gloucester (1831-1901)

Further information in the report states that the line 38.3 miles long, has four engines, four passenger cars, one mail/express car, and 46 freight cars. 

A first class ticket was 5 cents a mile.


*Lestor Manor





Saturday, November 6, 2021

Western New Kent 1866

 




A Civil War era map of the western half of New Kent County from Harper's Pictorial History of the Great Rebellion Part First published in 1866. The section shown, which I have cropped and enlarged, stretches from Matadequin Creek and the Pamunkey River in the North to Long Bridge Road and the Chickahominy River in the south. A seemingly accurate map a few features stand out to me. Two buildings marked as churches are unnamed. The one closest to Dispatch Station should be Providence Methodist. The one on the road to Long Bridge should be Emmaus Baptist. The other two are interesting as representing the fog of misinformation that winds up being published in a war even a civil war. In the northwest corner of the map we have a building marked down as "Hopesville Ch." which should be of course Hopewell Baptist Church. Stranger, at the site where St. Peters Episcopal should sit is a building marked as "Fish Hall." A little research has revealed that Lester Manor in King William County was know in the nineteenth century by the Pamunkey Indians. Lester Manor should be just off the eastern side of the map where the railroad crosses the Pamunkey. Lester Manor was the closest railroad depot to the Pamunkey Indian Reservation and the tribe sold a great deal of fish through the depot leading to the depot/house/ settlement being called "Fish Hall" or possibly even "Fish Haul." A report from the York River Railroad in October 1861 even refers to the depot as "Fish Hall.